top
left
logo
home aboutus our business kepong brem mall our projects financial contact us
 

 

Bukit Prima Pelangi

  Phase 1B
2 Storey Terrace Houses
Completed with CF
   
left Specifications right
OUR PROJECTS
Bukit Prima Pelangi Phase 1B
Prima Pelangi
 
left Specifications right
INT C1 C2
Electrical Fittings      
Lighting Point
17 20 20
Wall Light Point 8 8 8
13 Amp Power Point 13 12 12
15 Amp Power Point 2 2 2
Fan Point 7 7 7
TV Point 3 3 3
Telephone Point 3 3 3
Air-Cond Point 4 4 4
Door Bell Point 1 1 1
Exhaust Fan Point 1 1 1
Sanitary Fittings      
Water Closet 3 3 3
Wash Basin 3 3 3
Stainless Steel Kitchen Sink 1 1 1
Shower Rose 2 2 2
Long Bath and Mixer 1 1 1

 


 
.... back      
 
Structure:

Reinforced Concrete Framework

Wall:

Clay Brick & Cement Plaster

Roofs:

Concrete Roof Tiles

Ceilings:

Living, Dining, Kitchen, Guest Room, Bathroom:
Skim Coating & Emulsion Paint
Master Bedroom, Bedroom 2 & 3, and Family Hall:
Gypsum Plaster Ceiling and Emulsion Paint
Others:
Asbestos Free Cement Board with Emulsion Paint

Wall finishes:

Kitchen, bath ,Bath 1 & 2: 
Ceramic Tile to Ceiling Height
External Wall:
Plaster with Weather Shield Emulsion Paint
Others:
Plaster with Emulsion Paint

Floor Finishes:

Kitchen, bath ,Bath 1 & 2 Guest Room Terrace and Yard:
Ceramic Tile
Living, Dining, Family, Bedrooms:
Homogeneous Tile
Car Porch and Driveway:
Homogeneous Tile
Others:
Cement Render

Doors:

Main Door:
Decorative Timber Door
Others:
Plywood Flushed Door
Living & Master Bedroom:
Aluminium Frame Sliding Door

Windows:

Bedrooms, Kitchen and Bathrooms:
Aluminium Frame Window
Others:
Louvres Window

Others:
Brick Fence Wall with M.S Grilles
Mild Steel Gate.
Refuse Chamber with Letter box.
 
© 2007 BREM HOLDING Berhad, All Rights Reserved.
 
hosting-domains-search-marketing